一、补遗部分

I. Supplementary part

1、凭证应征人提问,,,,,现增补以下资料供应征人参考使用:各站点桥梁总安排图、平面图 、横断面图及桥墩结构图;; ; ;;;;卧龙镇、耿达镇总体妄想图、百年水位资料、场坪标高。。。。。桥梁横断面图中承轨梁及站台梁为按比例绘制,,,,,沿纵向横断面尺寸相同。。。。。
1. According to the questions raised by applicants, the following materials are supplemented for the applicant's reference: The general layouts, plans, cross-section profiles and pier structure maps of bridges at each station; master plans of Wolong Town and Gengda Town, water levels in a century and yard elevation. The rail-bearing beams and platform beams in the bridge cross-section profiles are drawn to scale, and the dimensions are the same along the longitudinal cross-section.

2、应征人在体例卧龙站、耿达站计划时,,,,,应从功效安排角度思量车站与相邻区域(地块)的关系,,,,,即在车站相邻区域思量针对旅游出行服务的配套内容。。。。。
2. When compiling schemes for Wolong Station and Gengda Station, applicants should consider the relationship between the station and adjacent areas (plots) from the perspective of functional deployment, that is, consider the supporting contents for travel service in the adjacent areas of the stations.

3、平面图中有初定的站房场坪规模,,,,,位置为初选位置,,,,,应征人可适当调解,,,,,但应避开区域基本农田规模(图中青色线)。。。。。
3. In the plan, there is a preliminarily determined area of the station building yard and the  is the preliminarily selected . The applicant may adjust it appropriately, but should avoid the basic farmland scope in the area (the cyan line in the figure).

4、是否接纳远程开标、远程陈述,,,,,将于6月25日通过邮件发送详细事宜,,,,,请拟应征的单位在6月24日24时前发送应征回执到指定邮箱(752636130@qq.com)。。。。。
4. Regarding whether remote bid opening and remote presentation will be adopted, specific matters will be sent by email on June 25. Please send the application reply to the designated email address (752636130@qq.com) before 24:00 on June 24.

5、陈述时间:8个站点总时间控制在25分钟以内,,,,,各站点分派时间由应征人自行确定。。。。。
5. Presentation time: The total time of the eight stations must be controlled within 25 minutes, and the time allocated for each station is determined by the applicant itself.

二、答疑部分
II. Q&A part

(一)共性问题:
(I) Common problems:

(1)各个站点平面安排图中已示意场坪位置,,,,,站房位置可凭证设计自行调解;; ; ;;;;站房东要功效和配套房间的控制面积需求详细开展设计时才提供,,,,,现在请凭证总面积控制要求开展看法计划设计。。。。。
(1) Floor plan of each station has indicated the yard , and the station building  may be adjusted according to the design; as the control area needs of station building's main functions and supporting rooms are not provided until the specific implementation of design, please implement the conceptual design according to control requirements of the total area at present.

(2)安检后未思量候车厅的设置:计划阶段暂不思量。。。。。
(2) The setting of waiting hall after security inspection is not considered: Not considered temporarily at the schematic stage.

(二)分站点问题
(II) Sub-station problems

1、虹口站:
1. Hongkou Station:

(1)站位置可以凭证需求举行调解,,,,,在前期研究历程中也思量了在线路北侧处设置高架平台,,,,,该处无拆迁问题,,,,,只需另行征地,,,,,也可重新思量站房位置,,,,,可有适量的拆迁工程。。。。。
(1) The station  may be adjusted according to requirements. In the process of preliminary research, the setting of an elevated platform on the track's north side is taken into account, as only additional land acquisition is required without involving demolition. The station building  may also be reconsidered with appropriate demolition work.

(2)站台位置可以移动,,,,,但后期需要与主体设计单位对接详细移动计划。。。。。
(2) The station platform may be moved, but the specific movement scheme should be docked with the main design agency subsequently.

(3)平面图中的污水处置惩罚站、给水加压站、混淆降压所都是永世设施。。。。。
(3) The sewage treatment station, water supply pressurization station and mixed step-down station in the plan are permanent facilities.

2、龙池站:
2. Longchi Station:

(1)只管凭证妄想场坪规模控制,,,,,阻止改变征地衡宇,,,,,但若有充分的使用和更好的计划可以思量调解。。。。。
(1) The scope should be controlled within the planned yard according to the planning to the maximum extent, so as to avoid changing the houses acquired. However, adjustment could be considered in case of full utilization and a better scheme.

(2)跨线设施一样平常情形下用隧道,,,,,也可思量天桥,,,,,天桥距离铁路净空需知足限界要求,,,,,详细可在后期设计历程中与主体设计单位详细对接。。。。。
(2) Track-crossing facilities are generally provided via tunnels. Overpasses are also considered with the clearance between the overpass and railway meeting the clearance requirements. The details may be docked with the main design agency in the subsequent design process.

(3)龙池站位置对原有蹊径举行了阻遏,,,,,涉及永世蹊径改移,,,,,改移蹊径详见龙池站平面安排图。。。。。
(3) The Longchi Station partitions original roads, involving permanent re of roads. See the floor plan of Longchi Station for the details of road re.

3、映秀站
3. Yingxiu Station

装备用房位置可自行调解,,,,,相关区域团结站房可作为停车、广场或景观使用,,,,,站房位置可不思量上方电线影响,,,,,电线可举行迁改。。。。。
The  of equipment room may be adjusted. Relevant areas may act as parking lot, square or landscape in combination with the station building. The station building  may not take into account the above wires, which could be relocated.

4、耿达站
4. Gengda Station

桥梁设计未思量桥站合一。。。。。
Combination of the bridge and station is not considered by the bridge design.

5、卧龙站
5. Wolong Station

(1)主体设计单位已经将该区域的场坪举行了填筑,,,,,场坪顺接蹊径,,,,,高于百年洪水位。。。。。
(1) The main design agency has filled the yard in the area. The yard is connected to roads with the elevation higher than the level of 100-year flood.

(2)相关场坪内的配套设施及修建请团结贵单位的明确开展设计。。。。。
(2) Please design the supporting facilities and buildings in related yards in combination with your understanding.

6、邓生沟站:
6. Dengshenggou Station

(1)邓生沟站场坪规模可适当调解,,,,,但面积不可增大。。。。。
(1) The yard scope of Dengshenggou Station may be adjusted as appropriate without increase in the area.

(2)征集文件中关于站台宽度、轨道数的表述与图纸纷歧致问题:以图纸为准。。。。。
(2) In case of inconsistency between the deion of platform width and track number in the solicitation s and the drawings: The drawings shall prevail.

7、巴朗山站:
7. Balang Mountain Station

(1)文字里程数与平面图位置里程纷歧致问题:以平面位置为准,,,,,但站房位置可凭证设计适当调解。。。。。
(1) In case of inconsistency between the text mileage and the mileage in the plan : The plan  shall prevail, but the station building  may be adjusted as appropriate according to the design.

8、四女人山站:
8. Siguniang Mountain Station

(1)用地规模可凭证计划调解,,,,,并团结地形思量与既有公路的接驳方法。。。。。
(1) The land use scope may be adjusted according to the scheme, with the delivery mode with existing roads considered in combination with terrain.

(2)车站规模有限,,,,,应只管思量分流。。。。。
2) Due to the limited scale of the station, diversion should be considered to the maximum extent.

(3)文字里程数与平面图位置里程纷歧致问题:以平面位置为准,,,,,但站房位置可凭证设计适当调解。。。。。中心里程,,,,,以“12-四女人山车站(施工图)”文件为准。。。。。
(3) In case of inconsistency between the text mileage and the mileage in the plan : The plan  shall prevail, but the station building  may be adjusted as appropriate according to the design. Center mileage is subject to the  "12-Siguniang Mountain Station (Construction Drawing)".

 

 

 

附件:2号补遗资料
Appendix: Supplementary Materials


                                     

      四川都金山地轨道交通有限责任公司

Sichuan Dujin Mountain Rail Transit Co., Ltd.


中国·永利集团(304am-VIP认证)官网-Official Platform

304永利集团唯一集团微信公众号

中国·永利集团(304am-VIP认证)官网-Official Platform

304永利集团唯一集团微信视频号

中国·永利集团(304am-VIP认证)官网-Official Platform

304永利集团唯一集团抖音号

中国·永利集团(304am-VIP认证)官网-Official Platform

304永利集团唯一集团今日头条号

Copyright ©2021 304永利集团唯一

电话:028-85139812 传真:028-81250178  蜀ICP备2021016147号

本网站支持IPV6会见 手艺支持

中国·永利集团(304am-VIP认证)官网-Official Platform

TOP

【网站地图】【sitemap】